(Drilling and excavation method)

Roof lifting and correction project at 158 Heshengyuan
(PLC hydraulic jack synchronous lifting method)
Correction project for commercial and residential building No. 4 in a certain community in Xining City (height 102 meters)
(Using the method of cutting off piles for forced landing)
Correction project for Building 13 in Xining
(Adopting the method of raft expansion, drilling and excavation, and anchor cable loading for forced…
Correction Project for Building 12 in Xining
(Adopting the method of raft expansion, drilling and excavation, and anchor cable loading for forced…
Correction Project for Building 11 in Xining
(Adopting the method of raft expansion, drilling and excavation, and anchor cable loading for forced…
Correction Project for Residential Building No. 3 of Qinghai Normal University (Height 97 meters)
(Using drilling and soil excavation+anchor cable loading forced landing method)
Reinforcement project of the “Daogu Sect” church in Angola, Africa
(Using comprehensive correction method)