• Home
  • About Us
  • Study case
  • Demonstration of the process
  • Contact Us
  • Q&A Section
  • Bahasa Indonesia
  • 中文 (中国)
  • Soft ground treatment, foundation stabilization and settlement control
  • Building rectification
  • Structural reinforcement and renovation of buildings
  • Seismic isolation and retrofitting of buildings
  • Building shifting and lifting
  • Road and bridge reinforcement
  • Cultural relics preservation
Xicheng Expressway Jiangyin Elevated Bridge

Xicheng Expressway Jiangyin Elevated Bridge

ETC Gate Frame of Sunan Expressway Network

ETC Gate Frame of Sunan Expressway Network

Ningsu Xu Expressway Bridge Maintenance and Reinforcement Project

Ningsu Xu Expressway Bridge Maintenance and Reinforcement Project

Ninglian and Ningtong Expressway Bridges

Ninglian and Ningtong Expressway Bridges

Ninglian and Ningtong Expressway Bridge Maintenance and Reinforcement Project

Bridge of Ninghang Expressway in 2016

Bridge of Ninghang Expressway in 2016

Nanjing Yangtze River Third Bridge Approach Bridge

Nanjing Yangtze River Third Bridge Approach Bridge

2020 Single Column Pier Bridge Maintenance and Reinforcement Project (Along the Yangtze River Section)

2020 Single Column Pier Bridge Maintenance and Reinforcement Project (Along the Yangtze River Section)

2019 Ninghang Expressway Bridge Maintenance

2019 Ninghang Expressway Bridge Maintenance

2019 Ningjing Salt Expressway ETC Gate Frame Foundation Construction Project

2019 Ningjing Salt Expressway ETC Gate Frame Foundation Construction Project

Page 1 of 3123»
  • Follow
  • Follow

PT.Warney Architecture Special Technology
Address:Jl. Kemuning No.9, RT.5 / RW.1, Jatipulo, Kec. Palmerah, Kota Jakarta Barat, Daerah Khusus Ibukota Jakarta 11430

Tel:JIANG CHAOYU Direktur 082128596039
Email: warneyarchitecture@gmail.com

mobile site

PT.Warney Architecture Special TechnologyAll rights reserved