Correction Project for Residential Building No.3 of Qinghai Normal University (Height 97m)
The tilt rate before correction is 2.66 ‰, and the tilt rate after correction is 0.87 ‰.
(Using drilling and soil excavation+anchor cable loading forced landing method)

Correction Project for Residential Building No. 3 of Qinghai Normal University (Height 97 meters)
.jpg)
