Rectification Project for Building 114 of Heshengyuan

Rectification Project for Building 114 of Heshengyuan
The tilt rate before correction is 10.2 ‰, and the tilt rate after correction is 2.07 ‰.
(Cut off pile+drill hole excavation and forced landing)