Rectification Project for Building 114 of Heshengyuan
The tilt rate before correction is 10.2 ‰, and the tilt rate after correction is 2.07 ‰.
(Cut off pile+drill hole excavation and forced landing)

Rectification Project for Building 114 of Heshengyuan

