Correction Project for Building 3 in a Residential Area in Gansu Province

Correction Project for Building 3 in a Residential Area in Gansu Province
The tilt rate before correction is 6.0 ‰, and the tilt rate after correction is 2.3 ‰.
(Drilling, soil excavation, forced landing and correction)