Correction project for Building 13 in Xining

Correction project for Building 13 in Xining
The tilt rate before correction is 2.07 ‰, and the tilt rate after correction is 0.07 ‰.
(Adopting the method of raft expansion, drilling and excavation, and anchor cable loading for forced landing)