Correction Project for Building 12 in Xining

Correction project for Building 12 in Xining
The inclination rate before correction is 1.33 ‰, and the inclination slope after correction is -0.19 ‰.
(Adopting the method of raft expansion, drilling and excavation, and anchor cable loading for forced landing)