The inclination rate before correction is 2.42 ‰, and the inclination slope after correction is -0.28 ‰.
(Adopting the method of raft expansion, drilling and excavation, and anchor cable loading for forced landing)


The inclination rate before correction is 2.42 ‰, and the inclination slope after correction is -0.28 ‰.
(Adopting the method of raft expansion, drilling and excavation, and anchor cable loading for forced landing)