Mingcuiliu Park Shijia Building 7 forced landing correction project
The tilt rate before correction is 2.66 ‰, and the tilt rate after correction is 0.97 ‰.
(Drilling and soil excavation forced landing+rope saw cutting forced landing method)

Drilling and soil excavation

Rope saw cutting
hydraulic jack