Correction Project for Building 3 in a Residential Area in Gansu Province
The tilt rate before correction is 6.0 ‰, and the tilt rate after correction is 2.3 ‰.
(Drilling, soil excavation, forced landing and correction)

Correction Project for Building 3 in a Residential Area in Gansu Province

