{"id":2509,"date":"2026-06-03T16:34:33","date_gmt":"2026-06-03T08:34:33","guid":{"rendered":"https:\/\/www.warneyrectify.com\/?p=2509"},"modified":"2026-06-03T16:34:34","modified_gmt":"2026-06-03T08:34:34","slug":"how-much-does-it-cost-per-square-meter-for-building-relocation-and-turning-construction-in-indonesia-how-is-the-total-price-calculated","status":"publish","type":"post","link":"https:\/\/www.warneyrectify.com\/?p=2509&lang=en","title":{"rendered":"How much does it cost per square meter for building relocation and turning construction in Indonesia? How is the total price calculated?"},"content":{"rendered":"<p><strong><b data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">1. Overview<\/span><\/span><\/b><\/strong><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Customized on demand with tiered pricing. Building relocation and rotation are high-tech specialized engineering projects. The basic construction unit price typically ranges between IDR 1,500,000 to IDR 5,000,000 per square meter. The total price consists of three main components: &#8220;underpinning cost + relocation\/rotation process fee + new foundation reconstruction fee.&#8221; Final quotations are determined by the building&#8217;s structural integrity, soil conditions along the moving path (Sondir data), and surrounding environmental complexity.<\/span><\/span><\/p>\n<p><strong><b data-imt-content-len=\"32\" data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">2. Market Reference Unit Price (Estimasi Harga per m\u00b2)<\/span><\/span><\/b><\/strong><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">The following unit prices are based on average levels in major cities of Java Island (e.g., Jakarta, Surabaya, Bandung):<\/span><\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Building Type<\/span><\/span><\/td>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Estimated Unit Price (IDR\/m\u00b2)<\/span><\/span><\/td>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Remarks<\/span><\/span><\/td>\n<\/tr>\n<tr>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Single-story Brick Masonry House (Rumah Bata)<\/span><\/span><\/td>\n<td data-imt-content-len=\"21\" data-imt-processed=\"imt-ctx-1780475641850\">1,500,000 \u2013 2,500,000<\/td>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Requires extensive foundation reinforcement, suitable for flood-proof elevation<\/span><\/span><\/td>\n<\/tr>\n<tr>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Multi-story framework building (Ruko\/Kantor)<\/span><\/span><\/td>\n<td data-imt-content-len=\"21\" data-imt-processed=\"imt-ctx-1780475641850\">2,500,000 \u2013 4,500,000<\/td>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Good structural stability, with main costs in hydraulic synchronous control<\/span><\/span><\/td>\n<\/tr>\n<tr>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Heritage\/Historical Buildings<\/span><\/span><\/td>\n<td data-imt-content-len=\"22\" data-imt-processed=\"imt-ctx-1780475641850\">4,000,000 \u2013 6,000,000+<\/td>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Involves special protection and expert supervision (TACB)<\/span><\/span><\/td>\n<\/tr>\n<tr>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Pure rotation\/in-situ lifting<\/span><\/span><\/td>\n<td data-imt-content-len=\"21\" data-imt-processed=\"imt-ctx-1780475641850\">1,000,000 \u2013 2,000,000<\/td>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">No long-distance sliding tracks, relatively lower costs<\/span><\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Note: The above prices are for &#8220;construction service fees&#8221; only, excluding taxes (PPN) and bulk material procurement costs (e.g., concrete and steel required for new foundations).<\/span><\/span><\/p>\n<p><strong><b data-imt-content-len=\"34\" data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">3. Total Price Calculation Formula (Skema Perhitungan Total)<\/span><\/span><\/b><\/strong><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Total Price = (Floor Area \u00d7 Base Unit Price) + Special Adjustment Fees + Third-Party Costs<\/span><\/span><\/p>\n<p data-imt-content-len=\"16\" data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>\u2474<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Basic fee (approximately 60% of the total price)<\/b><\/strong><\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Includes: construction of structural transfer beams (Ring Balk), hydraulic equipment mobilization (Mobilisasi), PLC system commissioning, and labor costs.<\/span><\/span><\/p>\n<p data-imt-content-len=\"20\" data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>\u2475<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Special adjustment items (accounting for approximately 30-40% of the total price)<\/b><\/strong><\/span><\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Project Adjustment<\/span><\/span><\/td>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Calculation Reference (IDR)<\/span><\/span><\/td>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Instructions<\/span><\/span><\/td>\n<\/tr>\n<tr>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Moving Distance<\/span><\/span><\/td>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">150k \u2013 300k \/ meter<\/span><\/span><\/td>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">involving track laying and multiple traction costs<\/span><\/span><\/td>\n<\/tr>\n<tr>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Rotation angle<\/span><\/span><\/td>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Base fee \u00d7 15% \u2013 25%<\/span><\/span><\/td>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">90\u00b0 or 180\u00b0 turns require setting up a core rotation support<\/span><\/span><\/td>\n<\/tr>\n<tr>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Soil Softness<\/span><\/span><\/td>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Base Fee \u00d7 20% \u2013 40%<\/span><\/span><\/td>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">If the soil is extremely soft, additional temporary subgrade reinforcement is required<\/span><\/span><\/td>\n<\/tr>\n<tr>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Obstacle Removal<\/span><\/span><\/td>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">As per site conditions (Lumpsum)<\/span><\/span><\/td>\n<td data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Clear trees, utility poles, and adjacent walls along the movement path<\/span><\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p data-imt-content-len=\"16\" data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>\u2476<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Third-party and administrative expenses (listed separately)<\/b><\/strong><\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">New foundation construction: The new foundation after relocation (e.g., micropile) needs to be calculated separately based on the soil mechanics report.<\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">License Approval (PBG\/SLF): Consultation fee for assisting with building permit modifications.<\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Taxes: Statutory Value Added Tax (PPN, currently typically 11%).<\/span><\/span><\/p>\n<p><strong><b data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">IV. Key Local Factors Affecting Pricing<\/span><\/span><\/b><\/strong><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Geographical Location (Lokasi Proyek): Due to the transportation of heavy hydraulic equipment, logistics costs (Mobilisasi &amp; Demobilisasi) outside Java Island (such as Sumatra, Kalimantan) will significantly increase the total price.<\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Construction Window (Musim): During the rainy season (Musim Hujan), construction requires additional drainage and slope support costs, potentially increasing the price by 10%-15%.<\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Neighborhood Compensation: In Indonesia&#8217;s compact communities (Perkampungan), fees may involve neighbor house monitoring or community coordination costs.<\/span><\/span><\/p>\n<p><strong><b data-imt-content-len=\"24\" data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">V. Calculation Example (Ilustrasi Biaya)<\/span><\/span><\/b><\/strong><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Assuming a two-story 150\u33a1 Ruko in Jakarta needs to be moved 15 meters and rotated 90 degrees:<\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Base Fee: 150\u33a1 \u00d7 3,000,000 = 450 million IDR<\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Relocation Fee: 15 meters \u00d7 200,000 = 3,000,000 IDR<\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Diversion Fee: 450,000,000 \u00d7 20% = 90,000,000 IDR<\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Estimated Total Price: Approximately 543,000,000 IDR (excluding new foundation pile costs and PPN)<\/span><\/span><\/p>\n<p><strong><b data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">VI. Cost-saving recommendations for property owners<\/span><\/span><\/b><\/strong><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Dry season construction: Reduces additional costs associated with drainage and soil reinforcement.<\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Simultaneous Optimization: Upgrade indoor pipelines during elevation to avoid secondary trenching.<\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Lump Sum Fixed Price: Sign fixed-price contracts with SBU-qualified companies to prevent cost overruns caused by material price increases during construction.<\/span><\/span><\/p>\n<p data-imt-content-len=\"29\" data-imt-processed=\"imt-ctx-1780475641850\">\u4e13\u5bb6\u5b9a\u5236\u65b9\u6848\uff08Specialized Proposal\uff09\uff1a<\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">To provide you with a legally binding formal quotation, I suggest you provide the following data:<\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Building coordinates\/city (involving logistics costs)<\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Building structure images (assessing the difficulty of underpinning)<\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Sondir soil test report (evaluating track support strength)<\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Exact moving distance and rotation angle<\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780475641850\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Would you like me to prepare a preliminary budget breakdown for your current project?<\/span><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>1. Overview Customized on demand with tiered pricing. B [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[146],"tags":[],"class_list":["post-2509","post","type-post","status-publish","format-standard","hentry","category-en1"],"_links":{"self":[{"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=\/wp\/v2\/posts\/2509","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2509"}],"version-history":[{"count":2,"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=\/wp\/v2\/posts\/2509\/revisions"}],"predecessor-version":[{"id":2540,"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=\/wp\/v2\/posts\/2509\/revisions\/2540"}],"wp:attachment":[{"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2509"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2509"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2509"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}