{"id":2586,"date":"2026-06-04T09:05:38","date_gmt":"2026-06-04T01:05:38","guid":{"rendered":"https:\/\/www.warneyrectify.com\/?p=2586"},"modified":"2026-06-04T09:05:40","modified_gmt":"2026-06-04T01:05:40","slug":"what-does-the-correction-fee-include-are-monitoring-acceptance-and-identification-included","status":"publish","type":"post","link":"https:\/\/www.warneyrectify.com\/?p=2586&lang=en","title":{"rendered":"What does the correction fee include? Are monitoring, acceptance, and identification included?"},"content":{"rendered":"<p><strong><b data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">1. Overview<\/span><\/span><\/b><\/strong><\/p>\n<p data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Valuation: Residential properties approximately IDR 15,000,000 \u2013 35,000,000, depending on the house area.<\/span><\/span><\/p>\n<p><strong><b data-imt-content-len=\"27\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">2. Default Included Items (Scope of Work)<\/span><\/span><\/b><\/strong><\/p>\n<p data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">When signing the Kontrak Kerja (Construction Contract), the following items should have been included in the total price:<\/span><\/span><\/p>\n<p data-imt-content-len=\"65\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>\u2474<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Pre-site Survey (Survey &amp; Analisa Struktur)<\/b><\/strong>Includes using a theodolite to measure tilt, preliminary soil investigation, and reinforcement design.<\/span><\/span><\/p>\n<p data-imt-content-len=\"38\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>\u2475<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Core Construction (Pekerjaan Utama)<\/b><\/strong>Foundation reinforcement, rectification, and temporary protection.<\/span><\/span><\/p>\n<p data-imt-content-len=\"78\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>\u2476<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Real-time Monitoring (Monitoring Masa Konstruksi)<\/b><\/strong>Real-time monitoring of settlement and inclination during construction. Indonesian formal companies regard it as a standard operating procedure (SOP) and should not incur additional charges.<\/span><\/span><\/p>\n<p data-imt-content-len=\"33\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>\u2477<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Restoration &amp; Cleaning<\/b><\/strong>\uff1a<\/span><\/span><\/p>\n<p data-imt-content-len=\"35\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>Field Cleaning<\/b><\/strong>: Removal of waste materials and slurry generated during construction.<\/span><\/span><\/p>\n<p data-imt-content-len=\"39\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>Crack Repair<\/b><\/strong>: Repairing wall and ground cracks caused by rectification work (base coating application).<\/span><\/span><\/p>\n<p data-imt-content-len=\"56\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>\u2478<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Administration &amp; Taxes (Pajak &amp; Biaya Admin)<\/b><\/strong>: A formal company quote should specify whether it includes VAT\/PPN (11%).<\/span><\/span><\/p>\n<p data-imt-content-len=\"103\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>\u2479<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Internal Acceptance (Serah Terima Pekerjaan)<\/b><\/strong>: The contractor submits a completion report (Laporan Selesai Pekerjaan), and jointly verifies whether the inclination has returned to the safe range (Tolerance limits).<\/span><\/span><\/p>\n<p><strong><b data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">3. Clearly state items not included and those requiring additional payment<\/span><\/span><\/b><\/strong><\/p>\n<p data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">In the context of Indonesia, the following projects are independent:<\/span><\/span><\/p>\n<p data-imt-content-len=\"80\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>\u2474<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Third-party Authorized Appraisal (Audit Struktur Independen)<\/b><\/strong>: If it involves property transactions or industrial use, it is necessary to hire an expert holding an IPTB (Professional Practice License) to issue an appraisal report.<\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Valuation: Residential properties approximately IDR 15,000,000 \u2013 35,000,000, depending on the size of the house.<\/span><\/span><\/p>\n<p data-imt-content-len=\"92\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>\u2475<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Government Approval Fees (Legalitas PBG\/SLF)<\/b><\/strong>: If there are significant changes to the house structure, updating the PBG (formerly IMB building permit) or applying for an SLF (Certificate of Habitability) will require additional official fees and agency service charges.<\/span><\/span><\/p>\n<p data-imt-content-len=\"110\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>\u2476<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Unforeseen Geological Factors (Force Majeure\/Extreme Soil Conditions)<\/b><\/strong>Indonesia is prone to earthquakes and has soft soil foundations. If deep peat layers (Gambut) or undiscovered underground water inflows are encountered during construction, it may trigger an Addendum.<\/span><\/span><\/p>\n<p><strong><b data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">IV. Special &#8220;Pitfall Avoidance&#8221; Reminders for the Indonesian Market<\/span><\/span><\/b><\/strong><\/p>\n<p data-imt-content-len=\"82\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>\u2474<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Beware of the &#8220;Missing Drawings&#8221; Risk<\/b><\/strong>: Many private residences lack original as-built drawings. If contractors use this as an excuse to increase prices during construction, the contract should specify in advance that &#8220;surveying and drawing costs are included.&#8221;<\/span><\/span><\/p>\n<p data-imt-content-len=\"101\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>\u2475<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Clarify Warranty Terms (Masa Pemeliharaan)<\/b><\/strong>: Rectification projects typically have a 3 to 6-month observation period (Retention Period). The contract should retain 5% \u2013 10% of the final payment, to be paid only after the observation period ends and no secondary settlement occurs.<\/span><\/span><\/p>\n<p data-imt-content-len=\"91\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>\u2476<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Neighborhood Coordination Fee (Koordinasi Lingkungan)<\/b><\/strong>: Construction noise or vibrations may lead to neighborhood complaints. The contract should clearly specify who is responsible for community coordination costs (typically, the owner handles relations while the contractor provides technical support).<\/span><\/span><\/p>\n<p data-imt-content-len=\"57\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>\u2477<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Legal Validity<\/b><\/strong>: Ensure the contract is signed with a Materai 10,000 (Indonesian stamp duty) to give it evidential weight in legal disputes.<\/span><\/span><\/p>\n<p data-imt-content-len=\"4\" data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\"><strong><b>Five<\/b><\/strong><strong><b>\u3001<\/b><\/strong><strong><b>Conclusion<\/b><\/strong><\/span><\/span><\/p>\n<p data-imt-processed=\"imt-ctx-1780535106127\"><span class=\"imt-translated-container\"><span class=\"imt-translated-content imt-translated-content-theme-none\" dir=\"ltr\">Monitoring and self-inspection during construction are standard free services; third-party assessments and government compliance procedures are additional charges. It is recommended to clearly state in the contract &#8220;Harga sudah termasuk pembersihan dan perbaikan kerusakan akibat konstruksi&#8221; (The price already includes post-construction cleanup and damage repairs) to prevent future disputes.<\/span><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>1. Overview Valuation: Residential properties approxima [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[87],"tags":[],"class_list":["post-2586","post","type-post","status-publish","format-standard","hentry","category-1-en"],"_links":{"self":[{"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=\/wp\/v2\/posts\/2586","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2586"}],"version-history":[{"count":2,"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=\/wp\/v2\/posts\/2586\/revisions"}],"predecessor-version":[{"id":2615,"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=\/wp\/v2\/posts\/2586\/revisions\/2615"}],"wp:attachment":[{"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2586"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2586"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.warneyrectify.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2586"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}